The sheetrock was hung last week and they just started sealing the joints today. The garage door was also installed. It sounds like we will be painting the inside this weekend. That is assuming everything dries as planned. The heating system is running for the first time to help that process along. The finish truck is scheduled to arrive on the 28th. I was told the ETA for a finished product would be about three weeks from there. Here are the latest photos. The siders will finish the porch after the concrete is poured.  